Skip to content
Independent China procurement Send a size list
China Procurement Desk

Gorilla Automotive Supplier Verification

We coordinate document requests, sample checks and third-party inspection for independent wheel-end sourcing. Tie each check to the supplier, part and revision under review.

Send your spec

Prepare your RFQ

  • Vehicle or OE cross reference
  • Size, load and mating interfaces
  • Quantity, market and destination

From brief to shipment

01

Clarify

Check whether the drawing identifies the hub and wheel sides. Ask who owns each unresolved tolerance.

02

Compare

Use the same spec and quantity for each quotation. List exceptions by SKU to make the comparison visible.

03

Verify

Log sample ID and test or inspection scope. Ask the buyer to accept deviations in writing.

04

Coordinate

Reconcile pack counts and carton marks against the purchase order before handing records to the buyer and forwarder.

Evidence before commitment

Supplier records

Entity and scope

Check whether any submitted IATF 16949 or ISO 9001 management-system certificate names the legal entity, site and activity under review. Product approval requires separate, applicable evidence.

Sample check

Fit and reference ID

Record the sample lot and drawing revision. For a ring, measure the mating diameters and check both faces seat without interference. Request a new review after material or dimensional changes.

Document scope

Market and model

For a wheel or tire inquiry, ask which requirement the buyer identified for the target market. If a supplier submits a wheel test report, match the model, rim diameter and width, PCD, offset, center bore and load rating to the offered SKU. Ask which runout limit and fixture apply to the sample, and record radial and lateral runout separately if inspection includes both.

Third-party review

Inspection record

For an illustrative 66.6 × 57.1 mm ring inquiry, have the buyer set ID, OD, height and chamfer tolerances before sampling. Ask the inspector to identify the lot, gauge and measurement locations, record readings against the drawing and flag any deviation. A fitted sample on the intended wheel and hub is a separate check for interference.

Buyer decision

Deviation register

Keep approved substitutions separate from open changes. A different clip material or ring tolerance goes back to the buyer before release.

Shipment handoff

Pack and label match

Compare carton marks, mixed-container quantities and final packing list against the accepted PO. Confirm which party prepares each document. One supplier can simplify traceability across size variants. A split order can broaden coverage, but requires separate lot and label records before consolidation.